Broader, Speedier and Smarter- IPMS system
Software Specification for Inventory and
purchase management system (IPMS)
Intent of specification: The specification is meant to create
a order supply management system for merchandising company Pratinidhi Pvt Ltd.
The scope of service will include
1. The
system should enable the company to register its client and supplier by
creating separate sets of ids
2. To track
about the present status of purchases made by the company from its supplier
3. Creating
an internal assessment system for the Pratinidhi Pvt ltd. To track on the present set of
inventories.
4. Track
about the orders made on the company by the various clients of the Pratinidhi Pvt Ltd.
5. To check
the feasibility of order based on the present inventory status.
Cl 1.1 Registration
This service
should help the companies supplier and clients to create log in id, by choosing
them selves as client or supplier from the GUI.
The database
would create separate list for supplier and client and could be accessible to
all company store manager.
Cl1.2 Tracking of purchases:
Once the
supplier is registered, the purchase operator should have the right to put the
material and order number against the material which has been purchased.
The
custodian to make any changes in the order group lies with the owner and the
purchase operator.
The order
book should have a separate column showing the present status of the purchases.
The three
status of orders should be:
1-ordered
2-Billed and
on the way
3- Material
received against the store name.
Cl1.3 Inventory
Once the
material is received it would directly get added to the inventory of the store
for which it has been procured.
Similarly
once the material against which client made an order the material will be
reduced from inventory.
Cl1.4 Orders
The clients
who have registered in the site can order from the site by choosing the
material of his requirement.
If the order
quantity is not in the city store of the city then the delivery schedule will
be 5days.
If the order
quantity is not present in any store the delivery schedule will be 10 days.
If the order
quantity is already in the store of the same city from where order has been
made then the delivery schedule will be 2 days.
If there is
no store in the city from where order has been made the delivery schedule will be
15 days.
However if
the customer assigned priority and ask for delivery anything less than the
above condition then it will call for extra charge of Rs 20000 per batch.
However if
the ordered quantity by the client is more than the stock available and has
been assigned priority level as mentioned above then the extra charge of Rs
40000 per batch will be charged to the customer. However in the same case if no
priority is assigned then no extra amount will be charged and the same will be
orderd immediately to our supplier and the delivery schedule will be within 15
days
The client
can easily track the status of there order from the system
Cl 1.5 Inventory Status
-The company
has 5 product line, which it kept in two stores across two different cities of the
same state. The product line details are as follows.
Manufacturer/size
|
42
|
40
|
38
|
36
|
Allen Solly
|
Full/half
|
Full/half
|
Full/half
|
full
|
Van heusen
|
Full/half
|
Full/half
|
Full/half
|
Full/half
|
Peter England
|
Full
|
Full
|
Full/half
|
Full/half
|
Park Avenue
|
Full/half
|
Full/half
|
Full/half
|
Full/half
|
Companies
store are located in -1 Kharagpur. 2. Durgapur.
The store 1
has a capacity of 50,000 batches with each batch containing 100 packets of
shirts.
The store 2
has a capacity of 40,000 batches with each batch containing 100 packets of
shirt each.
The
objective will be to see the status of inventory and depending on the status
create order to the supplier or create invoice to the customer as per the conditions
mentioned in cl no 1.4.
Cl 1.6 Documentation requirement:
Apart from
the service the service provider need to submit the following documents for the
system.
1-Process
flow diagram before technical and software development process
2-Test
reports
3-Instruction
manual before handing over of the project.
Any other
document required for the completeness of the system should be part of complete
handover.
The above
documents need to be approved from the M/S Pratinidhi pvt Ltd before further
proceedings along the work line.
Any
deviation from the above cl requirement should be considered deviation and
service provider should submit the list of deviation for the same.
The delivery
schedule of the service is within 90 days from the allotment of order and any
delay on the same will allow penalty.
All the clarification regarding any point would be discussed here in the post.